Business opportunity - Coal-fired power plant imports wet electrostatic precipitator system

Air clean up

Business opportunity - Coal-fired power plant imports wet electrostatic precipitator system

02 Jan, 2014

Published over 12 years ago. See the latest and most current information on Air clean up.

Zheneng Liuheng Coal-fired Power Plant (浙能六横火电厂), which is owned by Zhejiang-based Zheneng China Coal Zhoushan Coal-fired Power Co. (China) (浙能中煤舟山火电有限公司), has imported a wet electrostatic precipitator (ESP) system to treat sulfur emission, according to reports, but the name of the foreign supplier has not been disclosed.

The total cost of the power plant is expected to be  USD 1.3bn (CNY 8bn), but USD 327m (CNY 2bn) is earmarked for environmental protection systems, such as noise prevention systems, denitration and desulphurisation, desalination, wastewater treatment, solid waste management and dust removal .

Latest News

Explore Our Other Sites

Labmate Online
Less energy. Less infrastructure. Smarter sterilisation.
Explore more Arrow
Envirotech Online
A new generation of modular gas analyser
Explore more Arrow
Petro Online
Improving repeatability in diesel fuel lubricity testing
Explore more Arrow
Chromatography Today
Dr. Anupam Giri joins Chromatography Today as consultant editor to strengthen its technical expertise
Explore more Arrow