• Business opportunity - Coal-fired power plant imports wet electrostatic precipitator system

Air Clean Up

Business opportunity - Coal-fired power plant imports wet electrostatic precipitator system

Jan 02 2014

Zheneng Liuheng Coal-fired Power Plant (浙能六横火电厂), which is owned by Zhejiang-based Zheneng China Coal Zhoushan Coal-fired Power Co. (China) (浙能中煤舟山火电有限公司), has imported a wet electrostatic precipitator (ESP) system to treat sulfur emission, according to reports, but the name of the foreign supplier has not been disclosed.

The total cost of the power plant is expected to be  USD 1.3bn (CNY 8bn), but USD 327m (CNY 2bn) is earmarked for environmental protection systems, such as noise prevention systems, denitration and desulphurisation, desalination, wastewater treatment, solid waste management and dust removal .


Events

WEFTEC 2023

Sep 30 2023 Chicago, IL, USA

ECO WAVE

Oct 10 2023 Ljubljana, Slovenia

POLLUTEC

Oct 10 2023 Lyon, France

ENVITECH

Oct 10 2023 Brno, Czech Republic

H2O Accadueo International Water Exhibition

Oct 11 2023 Bologna, Italy

View all events