Biwater Secures a Further Contract in Nigeria

Water/Wastewater

Biwater Secures a Further Contract in Nigeria

03 Oct, 2008

Published over 18 years ago. See the latest and most current information on Water/Wastewater.

Biwater Nigeria Ltd has signed a contract with the Ministry of Water Resources, Kwara State, for the Procurement and Installation of low and high lift pumps at Asa Dam Waterworks in Ilorin.
This project, valued at Naira 2.2. billion (£9.5m), is to be completed within 18 months and is a follow on to the two successful projects already delivered by Biwater in Ilorin – The Ilorin Township Water Supply Scheme and the Ilorin Rehabilitation Scheme.
Biwater is an integral member of the team that is upgrading the supply of drinking water to the expanding population of Ilorin and this contract is further endorsement of the excellent performance that Biwater has demonstrated in Nigeria.

Latest News

Explore Our Other Sites

Labmate Online
Smart temperature control. Designed for the future.
Explore more Arrow
Envirotech Online
Vehicle-based methane detection system passes German suitability test
Explore more Arrow
Petro Online
PFAS reference standard combines ten analytes to support trace-level calibration
Explore more Arrow
Chromatography Today
High-load peptide purification
Explore more Arrow