South Africa’s Bokpoort CSP plant breaks African record for around the clock operation

Green energy

South Africa’s Bokpoort CSP plant breaks African record for around the clock operation

08 Nov, 2020

Published over 5 years ago. See the latest and most current information on Green energy.

ACWA Power, a leading Saudi Arabian developer, investor and operator of power generation and desalinated water plants and lead shareholder in the Bokpoort CSP Plant, announced today that the Bokpoort CSP plant has become the first renewable facility on the continent to complete a full week of continuous round the clock operation. Bokpoort CSP set the new African continental benchmark achieving 13 days (312 hours) of continuous operations on 23 October 2020, almost double the previous record it had set in March 2016. This accomplishment was made possible by optimally managing 9.3 hours of the thermal salt storage system overnight, which allowed for a perfectly timed transition to the solar field every morning for the entire duration of this effort.

The 50 MW concentrated solar power (CSP) plant with thermal storage was commissioned during the 2nd bidding window of South Africa’s Renewable Energy Independent Power Producer Programme (REIPPP) and has been setting consistent records since the commencement of its operation in 2016.

Latest News

Explore Our Other Sites

Labmate Online
Severe asthma study discovers hidden clusters of long-term health conditions
Explore more Arrow
Envirotech Online
EU ETS benchmark update puts industrial emissions data under sharper scrutiny
Explore more Arrow
Petro Online
New test method ASTM D8606 has been officially released
Explore more Arrow
Chromatography Today
Non-invasive flowmeters for real-time monitoring
Explore more Arrow