Replacement Groundwater Plant at UKAEA Harwell

Water/Wastewater

Replacement Groundwater Plant at UKAEA Harwell

14 Apr, 2008

Published over 18 years ago. See the latest and most current information on Water/Wastewater.

Jason Allen
1 min read
Download
Jason Allen reports on Bilfinger Berger Environmental Ltd’s project to design and build a groundwater containment plant for the UKAEA.

Explore Our Other Sites

Labmate Online
Electronic pipettes advance non-opioid pain research
Explore more Arrow
Envirotech Online
Reducing blockages, cross-contamination, and flow instability in ICP sample introduction systems
Explore more Arrow
Petro Online
Next-generation quartz crystal moisture analyser line expanded
Explore more Arrow
Chromatography Today
Chromatography and XFEL imaging reveal critical point behind water’s behaviour
Explore more Arrow